欧美精品久久久久久久自慰,东京免费视视频一区二区三下C,亚洲欧美中文人要字幕,婷婷字幕网久久

Your Position: Home > Support > Update Center

Cleaning and Replacement of Dust-proof Net of Vacuum Oil Filter

2019/8/1??????view:

  1. Clean the entrance dust-proof filter

  Tools needed:

  10mm, 17mm open wrench or socket wrench.

  The dirt shield for blocking coarse particles is located at the inlet flange of the pump (7/57). It should be kept clean to avoid a drop in pumping speed.

  The dirt shield is composed of two metal screen sieves. The outer screen can be seen when the intake pipeline is removed. If it's only slightly dirty, just remove the dirt from the outside of the network. If the net cover is dirty, remove the import valve orchid. To this end, remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom of the cover (7/94a), and remove the cover.

  Remove four screws and remove the intake flange (7/57) and gasket (7/55).

  Remove the clasp from the intake flange (7/57). Remove two metal screen sieves and wash them with appropriate solvent.

  Reload in reverse order. We recommend replacing the original pad with a new pad (7/55).

  warning

  According to the process involved, hazardous substances may spill over from pumps and oils. Take corresponding measures. Comply with safety regulations.

  Important Notes

  When handling used oil, please observe the relevant environmental regulations!

  Watch out

  Used seals must not be installed; new seals must be installed.

  2. Check the anti-return valve

  Tools needed:

  10mm, 17mm open wrench or socket wrench.

  Adjustment ring: 71072333

  To ensure the normal operation of the pump, keep the anti-return valve clean and clean. If the process gas inhaled by the pump contains a large amount of dust or dirt, we strongly recommend that a dust filter be installed before the pump inlet (see Section 1.4).

  First remove the intake pipe.

  Then remove the fastening screw at the top of the cylinder block cover (7/51a-52a), loosen the pump foot at the bottom (7/94a), and remove the cover.

  Remove four screws and remove intake flange (7/57) and gasket (7/55).

  Remove spring and oil return valve.

  If the anti-return valve is too tight, press the spring a little. The upper edge of the anti-ventilation line should be about 1-2 mm from the lower side of the intake port.

  Reload the intake. We recommend replacing the new gasket (7/55).

  The flat side of the anti-return valve is down.

  The large diameter end of the spring is downward and the small diameter end is opposite to the flat side of the anti-return valve. The anti-return oil valve has a ring of sealing line with one side facing up.

  warning

  According to the process involved, hazardous substances may spill over from pumps and oils. Take corresponding measures. Comply with safety regulations.

  Importantly, when dealing with used oil, please observe the relevant environmental regulations!

  Be careful not to install used seals; be sure to install new seals.


懂色AV 一区二区| 天天更新不卡精品一区| 人妻痴汉电车谷原希美558| 99久久精品捆绑| 国产精品久久久精品三级播放器 | 男女草B视频国产| 婷婷久在线视频| 超碰caoporn五月| 久久精品国产天天| 极品照片一区二区三区| 日韩AV一区二区三区中文字幕| 亚洲AV无码一区二区三区尤物| 性爱高跟麻豆| 亚洲AV永久一区二区三区久久| 强姧伦理至久久久久久久?| 亚洲精品男人在线视频| 麻豆插插激情| 亚洲天堂无码啊啊啊操| 不卡在线视频一区二区| 天天干天天弄天天搞| 国产成人亚洲综合V| 6699.com黄片| 国产精品十四页| 国产精品久久国产麻豆96堂| 国产无码ab| 欧美激情1区2区| 国产精品欧美13| 婷婷色影院小说| 成人网站在线看欧美日韩| 永久中文字幕第一页| 91AV观看| 欧美黄片一区二区三区四区久久| 成人精品视频在线观看一区| 日本夫妻性生活久久久久久| 国产精品无码一区二区三| ,亚洲欧洲中文字幕第一区| 亚亚洲AV男人天堂| 欧美日韩国产153| 精品国产Avvv999| 欧美 亚洲日韩一区| 国产农村妇女一二品区精品|